Customized Gingerbread Man LED Christmas Motif Lights 2PK 23in 50L 2D Fabric for Decorations
Description

Products Description
Diameter/Length |
23N(58.42cm)Height |
Power Supply |
Plug in or adaptor |
Certificates |
UL/CUL/CE |
Light color |
Clear incandescent bulb |
Lead in |
36IN (91.4cm) length |
Light QTY |
50L Clear |
Accessory |
Stakes, Spare Bulbs |
Input Voltage |
110V-220V |
Rated Wattage |
20.4 Wattage |
Working Temperature |
Above -10℃, under 40℃ |
Life Time (Hours) |
1,200 Hours |
Usage |
Indoor & outdoor use |
Function |
Steady on |
Application |
Festival Decoration |
OEM |
Min. Order: 300 Pieces |
Packing type |
Color box |
Single package size |
38.5*5*42.5cm |
Master carton size |
Customized |
Warranty |
3 Year |
Export Market |
All |

Gengerbread man is ready to bring happiness to your family and sets up easily for instant holiday fun.Including 50 pre-attached miniature clear bulbs inside the body.
Recommended Products
Company Profie
Product Catalogue
Products Description

Production Process

1.Bulb inspecton

2.Assemblying Light string

3. Cutting and Welding metal frame

4.Painting Metal frame

5.Wrapping thread on metal frame

6.Checking lights and assemblying light string on metal frame

7. Packing

8. Inspection

9. Shipping
FAQ
1. Are you a factory or trading company?
A: We are the first hand manufacture factory. We also have our own trading and shipping department.
2. Are you ODM or OEM factory?
A: We are both ODM & OEM factory.
3. Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
4. What about the lead time?
A:Sample needs 3-7 days. Order quantity less than 300pcs, mass production time needs 15-20 days;the quantity is less than 5000,
and the delivery time is 45 days;more than 10000pcs, the lead time need to negotiate.
5. What is your MOQ?
A: Usually our MOQ is 300pcs, 1pc for sample checking is available
6. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT, V.Logistic. It usually takes 3-5 days to arrive. Airline and sea shipping also
optional.
7. Can you design new product or package for us ?
A: Yes. We have a professional team with rich experience in both production design and packaging design.
8: What are your terms of payments?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.
A: We are the first hand manufacture factory. We also have our own trading and shipping department.
2. Are you ODM or OEM factory?
A: We are both ODM & OEM factory.
3. Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
4. What about the lead time?
A:Sample needs 3-7 days. Order quantity less than 300pcs, mass production time needs 15-20 days;the quantity is less than 5000,
and the delivery time is 45 days;more than 10000pcs, the lead time need to negotiate.
5. What is your MOQ?
A: Usually our MOQ is 300pcs, 1pc for sample checking is available
6. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT, V.Logistic. It usually takes 3-5 days to arrive. Airline and sea shipping also
optional.
7. Can you design new product or package for us ?
A: Yes. We have a professional team with rich experience in both production design and packaging design.
8: What are your terms of payments?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.


